8. Performance:
S. Parameter Achieved Target for Till Nov % Improvement
No. 2018-19 19-20 Actual 2019 Over Over
18-19 Target Actual Target Last year
1. Asset Failures 43 30 33 20 31 55 6.1
2. DEMU DPC 12.14 11.8 11.26 11.8 11.17 5.3 0.8
Ineffective
TC 4.7 5.5 4.65 5.5 3.83 30.4 17.6
3. DEMU -
Punctuality loss - 1 0.67 - - -
9. Infrastructure:
06 Locos Capacity Loco Schedules Bays with EOT Cranes
06 Locos CapacityLoco Heavy Repairs with EOT Cranes
02 Pit lines of 08 DEMU Coach Capacity with EOT Cranes
04 Pit lines of 02 Coach Capacity for DEMU Major Repairs with EOT Cranes
01 Coach length Pit with covered shed for SPART/SPMRV maintenance
HSD oil installation of 200 KL capacity RCD operated by M/S BPCL
Bulk Lube oil installation of 100 KL capacity
Effluent Treatment Plant of 5000 Ltrs/Hour capacity.
Incinerator of 50 kg/Hour Capacity
10. Important M&P:
Under floor CNC Wheel Lathe (BG)
Fork Lift Truck
Whiting Jacks
Road mobile cranes
11. Important Test Equipments:
Computerized Water Load Box
Spectrometer for testing lube oil
Loco Fuel Injection Pump Test Stand
Speedometer Test Stand
Ferrous debris monitor
Computerized SFC recorder
Mobile load box