IMPROVEMENTS CARRIED OUT FOR REDUCTION OF FAILURES
Replaced 11.24 Kms of Defective Signalling Cables identified during annual
cable meggering.
Replaced 784 nos. of various capacities of secondary cells which completed
their codal life.
Replaced 24 Nos. of worn out point machines along with ground connection
and insulations.
Replaced 192 nos. of worn out panel knobs.
Annual Cable meggering completed at 72 locations as per schedule. No
locations are overdue.
System Integrity test carried out at 09 stations as per schedule. No stations are
overdue.
Replaced 141 Nos. of over aged Track Feed Battery Chargers.
ASSISTANCE REQUIRED
RRB indents sent to Hqrs. for 14 posts of ESM Gr.II, 14 posts of ESM Gr.III
and 10 posts of TCM Gr.III in the year 2015 but no allotment given.
RRB indents sent to Hqrs. for 06 posts of ESM Gr.II, 16 posts of ESM Gr.III
and 12 posts of TCM Gr.III in the year 2016 but no allotment given.
Proposal for creation of 04 posts for MLR Workshop at KRNT has been sent to
Hqrs. Same may be sanctioned.
Proposal for creation of 21 posts for MMTS Phase – II has been sent to Hqrs.
Same may be sanctioned.