18    Nov-20      S&T disconnection & reconnection notice related.              01.11.2020   15.11.2020
         19    Nov-20      Stabling, securing & security of the trains.                  11.11.2020   25.11.2020
         20    Dec-20      working on running lines & safety at work sites.               01.12.2020   15.12.2020
         21    Dec-20      Cab  changing  procedures  and  to  prevent  rolling  down  of  29.12.2020   12.01.2021
                           locomotives
         22    Dec-20      Ensure safe train operations                                  30.12.2020    13.01.2021
         23    Jan-21      Ensuring  safety  while  executing  works  adjacent  to  running  02.01.2021   16.01.2021
                           lines.
         24    Jan-21      Winter season precautions                                     21.01.2021    19.02.2021
         25    Jan-21      Maintainance of Track at Fish plates joints, Glued joints and  28.01.2021   11.02.2021
                           major Bridges with ballasted deck.
         26    Jan-21      Ensure  proper  insulation  is  available/provided  for  the  28.01.2021    11.02.2021
                           rodding at all manned LCs
         27    Jan-21      Ensuring  availability  of  First  aid  box  with  standard  list  of  28.01.2021   11.02.2021
                           Medicines
         28    Feb-21      Maintenance of points and crossings                           01.02.2021    15.02.2021
         29    Feb-21      Maintainance of Track and Points & Crossings in yards as  09.02.2021        10.03.2021
                           well as strict observance of rules in shunting.


          10. Safety circulars:

          Safety circulars are issued regularly to educate the staff to inculcate safety consciousness and to appraise
          the staff with latest information. The following 15 Safety Circulars and  14 General Circulars were issued
          upto January 2021.

          SAFETY CIRCULARS:
            No.                                           Subject
             1/20   Regarding GLP Check. (G&SR 4.31)
             2/20   Non-interlocked working (Appendix-III)
             3/20   Station working rules (GR 5.06 and APP.-XIV)
             4/20   Precautions to avoid Yard Derailments.
             5/20   Prevention of Fire in Passenger Carrying Trains.
             6/20   Prevention of SPAD.
             7/20   Train operation in case of Loco pilot and/or Guard experiencing any abnormal
                    Condition in the track, information sabotage or likely sabotage to the Track/Bridge/fixed
                    installation and obstruction on adjacent line(s).
             8/20   Monsoon precautions
             9/20   Prevention of Roll back of train during power interception/ loco reversal
             1020  Shunting Precautions.
            11/20  Knowledge of rules for Gateman – need for intensive counselling.
            12/20  Winter precautions.
            13/20  Duty for securing safety.
             1/21   Disconnection and Reconnection (SR 3.51.6 &  App.XIII).
             2/21   Detaching Engine.