Page 3 - CRS - Operating
P. 3

HYDERABAD DIVISION LOAD TABLE
                                                                                   WDM2/3A  WDG3A           WDG4
                               SECTION                           LOAD                                                               Remarks
                                                                                   SH    MU    SH  MU  SH        MU
                                                       42 BCNL/ 42BCNAL            NP    P*    NP  P      P*$    P    * Train not to be stopped at Home
                               MLY-DHNE                                                                               signal of MJF, FM, NSVP (Gate),
                           (Distance :305 KM;          58 BCNHL/ 59 BOXNL          NP    NP    NP  P*     NP     P    BDVL, SHNR, MBNR & GWD.
                            Gradient : 1/100,          45 BOST/ 45 CONCORD         NP    P*    NP  P*     P*$    P
                     Loop Line capacity : 686 meters)                                                                 $Banker to be provided from MLY to
                                                       43 BRN/ 50 BTPN/ 45 BLC  NP       P*    NP  P*     P*$    P    BDVL for CC+6+2 and above Loads.

                                                       42 BCNL/ 42BCNAL            NP    P*    NP  P*     P*$    P    Run through to be given at DTP, MQN
                               DHNE-MLY                                                                               & BABR stations
                           (Distance :305 KM;          58 BCNHL/ 59 BOXNL          NP    NP    NP  P*$  NP       P    * Train not to be stopped at Home
                            Gradient : 1/100,          45 BOST/ 45 CONCORD         NP    NP    NP  P*     P*$    P    signal of DUU, SHNR, UR & STPD
                     Loop Line capacity : 686 meters)                                                                 $Bankers to be provided from FM-
                                                       43 BRN/ 50 BTPN/ 45 BLC  NP       NP    NP  P*     P*$    P    SC/MJF for CC+6+2 and above loads.

                                                       42 BCNL/ 42BCNAL            NP    P*    NP  P*     P*$    P
                               MLY-MUE                                                                                * Train not to be stopped at home
                           (Distance :254 KM;          58 BCNHL/ 59 BOXNL          NP    NP    NP  P*     NP     P    signal of MJF and chord line starter.
                            Gradient : 1/100,          45 BOST/ 45 CONCORD         NP    NP    NP  P*     P*$    P    $Banker to be provided from MLY to
                     Loop Line capacity : 686 meters                                                                  BMO for CC+6+2 and above Loads.
                                                       43 BRN/ 50 BTPN/ 45 BLC  NP       NP    NP  P*     P*$    P

                                                       42 BCNL/ 42BCNAL            NP    P*    NP  P*     P*$    P    * Train not to be stopped at Home
                               MUE-MLY
                          (Distance in kms:254;        58 BCNHL/ 59 BOXNL          NP    NP    NP  P*     NP     P    signal of MED and Run through to be
                                                                                                                      given at SCP.
                            Gradient : 1/100,          45 BOST/ 45 CONCORD         NP    NP    NP  P*     P*$    P
                     Loop Line capacity : 686 meters                                                                  $Banker to be provided from IDL to
                                                       43 BRN/ 50 BTPN/ 45 BLC  NP       NP    NP  P*     P*$    P    UPW for CC+6+2 and above Loads.
                    Note: P: Permitted, NP: Not permitted.
                    1. In addition to trailing loads mentioned, brake van is permitted.
                    2. In case of stalling the Loco Pilot should not indefinitely try to pull the load thus causing wheel slip and damage to rails. Instead ask for relief /
                    banker engine or work in two portions as per necessity.
                    3. SH of any class of any Loco can take full length of empty train.
                    4. In case of in climate weather or CD of SR 30 KMPH and below is imposed at the foot or peak of gradient, banker Loco to be provided
                    5. Load table is prepared for standard composition rakes.
                        A) for BCN/BCNA 42B)BCNHL 58C)BOX/BOXNHL 59 D) BOST/Concord 45 E) BRN 43 F) BTPN 50 G)BLC 45
                    6. If stalling take place an account of not following the above conditions failure/ detection/ punctuality loss to coaching trains shall not be
                    shown on loco account

                                                                                                                                                    Page 3 of 8
   1   2   3   4   5   6   7   8