Page 4 - CRS - Operating
P. 4

HYDERABAD DIVISION - LOAD TABLE FOR GOODS TRAIN (ELECTRIC)
                                 SECTION                          LOAD                 WAG 5         WAG 7        WAG 9
                                                                                                                                       Remarks
                                                 UP DIR                               SH    MU     SH     MU     SH     MU

                       MLY/Cabin-MJF-STPD-FM          42BCNL/42BCNAL                 NP  P         NP     P      P#*    P      * Not to stop at H/S of FM,
                        (Distance:  22KM, Ruling      58 BCNHL/59 BOXNL              NP  NP        NP     P      NP     P                 MJF

                             Gradient 1/150,                                                                                  # Banker to be given during
                         LL Capacity 686 meters)      45 BOST/45 CONCORD/            NP  P         NP     P      NP     P
                                                      43 BRN/50 BTPNL/45 BLC                                                       inclement weather.


                       FM-STPD-MJF-MLY/Cabin          42BCNL/42BCNAL                 NP  P                P      P      P
                        (Distance: 22 KM, Ruling      58 BCNHL/59 BOXNL              NP  NP        NP     P             P
                             Gradient 1/150,
                         LL Capacity 686 meters)      45 BOST/45 CONCORD/
                                                      43 BRN/50 BTPNL/45 BLC

                       Note: P-permitted, NP- not permitted
                       1) In addition to trailing loads mentioned, BV is also permitted.
                       2) In case of stalling the driver should not indefinitely try to pull the load thus causing wheel slip and damage to rail. Instead ask
                       for relief/banker engine
                       3)  If stalling takes place on account of not following the above conditions failure/ detention / punctuality loss to coaching trains
                       shall not be shown on loco account.
                       4) SH of any class of any loco can take full length empty train of any stock.
                       5) In case of inclement weather and CD of SR 30 kmph and below is imposed at the foot/peak of gradient, banker to be
                       provided where frequent stalling occurs.
                       6) SH of any class of any Loco can take full length of empty train.
                       7) Load table is prepared for standard composition rakes
                       A) for BCN/BCNA-42, B) BCNHL-58, C)BOXN/BOXNHL-59, D)BOST/CONCORD-45, E)BRN-43, F)BTPN-50& G)BLC-45







                                                                                                                                                    Page 4 of 8
   1   2   3   4   5   6   7   8