Page 8 - CRS - Mech
P. 8
6. Mechanized Laundry:
Maintenance of departmental laundry of 2 Ton capacity per day.
As the capacity of departmental laundry is not adequate, 2Ton/day linen washing is also
outsourced.
Presently, laundry is not functional as there is no supply of linen.
7. C&W Performance
Actual
Propo-tionate
Performance Index (20-21) (21-22)
Target (21-22)
upto Sept upto Sept
Ineffective of AC coaches 1 0.41 0.37
Ineffective Non-AC coaches 0.75 0.09 0.21
Enroute coach Territorial 0.5 0 0
detachments Ownership 1 0 0
IOH NA 138 196
Coaches marked sick within 100 days NA 0 0
Punctuality Direct 1 7 3
Losses In Direct 1.5 5 2
8. End to End freight examination has been started at Nizamabad from 03.11.2020 with the
existing facilities.
9. ‘B’ class ART is available at NZB.
10. Area training centre available at KCG for training of Technicians and Khalasis of HYB and
NED divisions.
Page 8 of 8