Page 3 - CRS - Mech
P. 3

Category     Sanction     Actual   Vacancy     Excess                      Remarks


                                                                   Mandatory trainings status
                                                                     Pann  Tech     Tech     G&SR      G&SR
            LP (Pass)       144        68         76          0      el    Done     pending   Done     Pending
                                                                     73    3        70       17        56

           LP(Goods)        117        143        0          26                           -


             LPS-1          17         15         2           0    Only 2 Candidates submitted willingness among the
                                                                   eligible  candidates,  they  have  been  sent  for
                                                                   mandatory trainings.
             LPS-II         17          3         14          0


              ALP           251        268        0          17                         -----


              Total         596        542        97         43                           -
                            596
                                                                   During Dec-20 selection no ST Candidate qualified
               CLI          26         23         3           0    and two CLIs got medically de-categorised.


           2.4 System Improvements by Mechanical (Power) Organization:

              1)  “NO SPAD” Resolution Bell and Board provided at all lobbies.
              2)  All LPs/ALPs are counselled to write pledge while signing on that “I will strictly adhere to aspect of
                  signal and i will not presume the aspect of the signals”.
              3)  No  crew  should  leave  HQ  without  prior  permission  during  rest/PR.  After  return  from  leave/PR
                  declaration is being obtaining from crew that they have availed proper rest.
              4)  As per HQ guidelines BA check was suspended to avoid spreading of COVID-19 and random BA
                  sampling  was  implemented  and written  declaration  is  being  obtaining from  crew  those  who  are
                  COVID bye pass that they are in sober condition.
              5)  Chalakdal  mobile  app  for  contactless  Sign  On/Off  is  being  implemented  to  avoid  spreading  of
                  COVID-19.
              6)  Practical demonstration to ALPs on application of D1-Emergency when LP not controlling train at
                  danger signal is being carrying out by CLIs while conducting Footplate inspection.

           Special focus is being done in counselling the staff on:
                    i.  Crew should not deviate from their driving duties.
                    ii.  They should follow Signal and only signal aspect and not to presume the signals.
                   iii.  They should always keep their train well under control according to the signal aspect.
                   iv.  ALP  to  apply  emergency  brakes  without  hesitation,  in  case  LP  is  not attentive or
                       active in controlling the train according to the signal aspects and when approaching Danger.













                                                                                                     Page 3 of 8
   1   2   3   4   5   6   7   8