Page 2 - CRS - Mech
P. 2

The following facilities provided in all Running Rooms:

                       All running/Rest rooms    NZB, KCG, MBNR, GWD & KRNT are provided with Air
                         conditioning.
                       At KRNT, KCG & GWD Rest rooms, Meditation room, Dining hall, Kitchen.
                       RO purified drinking water with water coolers.
                       Hot water dispensers.
                       Washing machine, and Iron Box and Ironing pad provided.
                       Outsourced in all respects including housekeeping.
                       Solar hot water system provided at NZB, KRNT & GWD.
                       Exclusive Standby power supply provided at GWD.
                       All running/rest rooms NZB, KCG, MBNR, GWD & KRNT are provided with CCTV
                         and surveillance system.
                       Digital bed occupation system was provided at NZB Running room.

           2.0 Performance:

           2.1 Achievement of targets.
                                                       Apr-20 to Sep-20             Apr-21 to SEP-21
                          Parameter
                                                     Target         Actual        Target         Actual
               Diesel Loco Utilization                571            399            430            403
               09 Hrs Compliance %                     85            68.7           85            61.4
               Punctuality loss of trains in Dsl
               Loco Account                             0             0              0              2
               Punctuality loss of trains on            0             0              0            0.167
               Crew account
               Stalling on account of Dsl Loco          0             0              0              0
               Average Speed                           50             45           50.0            56


           2.2 Loco Pilots involved in accident Cases:

                              Subject                    Apr-20 to Sep-20          Apr-21 to SEP-21
                 Yard derailments                                0                          0
                 Signal Passing At Danger                        0                          0
                 Collision                                       0                          0
                 LPs involved in accidents in other              0                          0
                 Division/Zones
           2.3 Position of running staff


           Category     Sanction     Actual   Vacancy     Excess                      Remarks


                                                                   3  LPM  working  as  CC/PRC.  After  completion  of
            LP (Mail)       50         45         5           0    CC/PRC selection they will be repatriated.





                                                                                                     Page 2 of 8
   1   2   3   4   5   6   7