Page 4 - MECHANICAL C&W
P. 4

Coaching trains: Status of maintenance facilities:

                                         Holding
                                 Pit                    Pit      Cat     HP
                      Depot             Capacity                               Drainage  M&P
                                line                  lights    walks    jet
                                          (ICF)
                                PL-2        24          A         A       A        A          A
                       KCG      PL-3        24          A         A       A        A          A
                                PL-4        24          A         A       A        A          A

                     Note:  A – Available, NA-Not available

               6.  Mechanized Laundry:

                      Maintenance of departmental laundry of 2 Ton capacity per day.
                      As the capacity of departmental laundry is not adequate, 2Ton/day linen washing
                       is also outsourced.
                      Presently, laundry is not functional as there is no supply of linen.

               7.  C&W Performance

                                                                   Propo-             Actual
                                                                   tionate
                               Performance Index                               (20-21)      (21-22)
                                                                   Target
                                                                  (21-22)     upto Sept  upto Sept
                    Ineffective of AC coaches                         1         0.41         0.37
                    Ineffective  Non-AC coaches                     0.75        0.09         0.21
                    Enroute coach       Territorial                  0.5          0            0
                    detachments         Ownership                     1           0            0
                    IOH                                              NA          138         196
                    Coaches marked sick within 100 days              NA           0            0
                    Punctuality         Direct                        1           7            3
                    Losses              In Direct                    1.5          5            2


                 8.  End to End freight examination has been started at Nizamabad from 03.11.2020
                     with the existing facilities.

                 9. „B‟ class ART is available at NZB.

                 10. Area training centre available at KCG for training of Technicians and Khalasis of
                     HYB and NED divisions.