Page 11 - CRS safety corrected
P. 11
9. Safety Drives:
The following 29 safety drives have been conducted on the division upto January-2021, involving
officers and supervisors. Irregularities brought out were rectified and concerned staff were
counseled suitably.
S. Month & Subject Period
No Year From To
1 Apr-20 Ensuring safety while executing works adjacent to running 01.04.2020 15.04.2020
lines.
2 May-20 Prevention of LC gate open cases. 01.05.2020 15.05.2020
3 May-20 Prevention of trespassing on railway Track- reiterating 10.05.2020 24.05.2020
relevant instructions and awareness drive among railway
staff.
4 May-20 Prevention of yard derailments. 15.05.2020 29.05.2020
5 Jun-20 Maintenance of points and crossings. 01.06.2020 15.06.2020
6 Jun-20 Safety of work sites for various works done adjacent to 27.06.2020 11.07.2020
running lines.
7 Jul-20 short cut methods. 01.07.2020 15.07.2020
8 Jul-20 proper closing of doors of OHE tower wagon while on run. 15.07.2020 29.07.2020
9 Jul-20 Maintenance of track and points& crossings in yards as well 22.07.2020 05.08.2020
as strict observance of rules in shunting.
10 Aug-20 stabling and securing precautions. 01.08.2020 15.08.2020
11 Aug-20 Prevention of Fire accident. 28.08.2020 11.09.2020
12 Sep-20 single car test of a coach. 01.09.2020 15.09.2020
13 Sep-20 Prevention of SPAD. 24.09.2020 08.10.2020
14 Oct-20 Exchange of all right signals. 01.10.2020 15.10.2020
15 Oct-20 Safe train operations. 07.10.2020 21.10.2020
16 Oct-20 Safety while operating track machines. 28.10.2020 10.11.2020
17 Oct-20 Safety at work sites adjacent to running lines. 28.10.2020 10.11.2020
18 Nov-20 S&T disconnection & reconnection notice related. 01.11.2020 15.11.2020
19 Nov-20 Stabling, securing & security of the trains. 11.11.2020 25.11.2020
20 Dec-20 working on running lines & safety at work sites. 01.12.2020 15.12.2020
21 Dec-20 Cab changing procedures and to prevent rolling down of 29.12.2020 12.01.2021
locomotives
22 Dec-20 Ensure safe train operations 30.12.2020 13.01.2021
23 Jan-21 Ensuring safety while executing works adjacent to running 02.01.2021 16.01.2021
lines.
24 Jan-21 Winter season precautions 21.01.2021 19.02.2021
25 Jan-21 Maintainance of Track at Fish plates joints, Glued joints and 28.01.2021 11.02.2021
major Bridges with ballasted deck.
26 Jan-21 Ensure proper insulation is available/provided for the 28.01.2021 11.02.2021
rodding at all manned LCs
27 Jan-21 Ensuring availability of First aid box with standard list of 28.01.2021 11.02.2021
Medicines
28 Feb-21 Maintenance of points and crossings 01.02.2021 15.02.2021
29 Feb-21 Maintainance of Track and Points & Crossings in yards as 09.02.2021 10.03.2021
well as strict observance of rules in shunting.
79