Page 16 - CRS Electrical
P. 16

DETAILS OF ROBs IN KCG - FM SECTION OF HYB division


                 Sl.
                 No.         Location          Section       ROB         Station     Contact wire ht.in
                                                                                     mts
                  1    10/5-7                KCG – FM                                        5.55
                  2                          KCG – FM        ROB          DQR                5.64
                       10/6-8
                  3    13/19-21              KCG – FM                                        5.55
                                                             ROB          HPG
                  4    13/20-22              KCG – FM                                        5.45
                  5    15/2-4 [ROAD- 1]      KCG – FM                                        5.65
                  6                          KCG – FM                                        5.70
                       15/1-3 [ROAD- 2]
                  7    15/1-3 [ROAD- 3]      KCG – FM        ROB           FM                5.54
                  8                          KCG – FM                                        5.78
                       15/1-3 [ROAD- 4]
         POWER LINE CROSSINGS Details IN Kacheguda - Falaknuma Section

                                                                                    Clearance  from OHE
                      Section Between                                  Type of     to bottom of Powerline
              Sl.No                          KM.no/ Location
                           Stations                                    Voltage         Xing conductor
                                                                                         ( in meters)
                1        KCG - MXT           8/27-29,  8/28-30         33 KV                 5.89
                2        FM - BDVL               15/17-18              33 KV                 9.08
                3        KCG - MXT           8/25-27,  8/26-28         132 KV                7.58

                4        FM - BDVL               15/18-19              132 KV                8.63

         Punctuality cases- Failures:

                 SlNo              Reason              2019-20 (APR-JAN)       2020-21 (APR- JAN)


                     1      Block burst                          -                         -


                     2      Insulator failures                   -                         -
                     3      Maintenance                          -                         -


                     4      Miscellaneous                       3                          -

                     5      Head on Collusion                   1                          -

                                        Total                   1                          -

                                                           66
   11   12   13   14   15   16   17