Page 1 - EMU MLY.pdf
P. 1
EMU CAR SHED , MOULA-ALI
1. Auxillary Compressor Inspection Cover Modification:
An inhouse modification of inspection cover for auxillary compressor in 3phase
EMU Motor coach has been carried out due to an inaccessible area and difficult to
open the closed inspection cover for checking of carbon brushes and commutator.
This inspection cover cannot be removed due to less space between auxiliary
compressor and coach side wall .This modification is completed in all the 24 of AC
EMU 3phase motor coaches.
Inaccessible space Modified cover
2.Pantograph test bench:
An in-house test bench is developed for 3- Phase EMU/MEMU Pantographs testing
before fitment. PCME/SCR inaugurated the test bench. In appreciation for in-house
development of the 3 phase pantograph test bench. Award of Rs.2000/- was
announced.
Page 1 of 5