Page 1 - mechanical.pdf
P. 1

MECHANICAL


                                                (Carriage & Wagon)


              1. As  per  Hqrs  instructions,  three  COVID-19  isolation  rakes  were  made  ready  at
                 Kacheguda depot and stabled at UR, SHNR & MED stations.





















                Mosquito net was provided for all the             Hand showers & long body taps are
                               windows.                                provided for bathing facility.





















                       Oxygen cylinder bracket.                   Gunny bags fixed on top of the roof.




            2.  In  the  month  of  June,  Coaching  Depot/KCG  has  undertaken  IOH  for  45  coaches,  the
               highest ever in the last 4 years.

            3.  Computer  based  SCTR  is  introduced  to  ensure  that  all  the  stipulated  tests  are  being
               carried out without fail either intentionally or accidentally. Most of the supervisors and staff
               have been imparted training on working with this computerized SCTR.

            4.  First  Kisan  Rail  was  maintained  on  24-8-2021  with  12  VPUs  at  Coach  Maintenance
               Depot, KCG and was dispatched to Agartala in Tripura state duly transporting 284 tonnes
               of onion thus generating revenue of Rs.18.3 Lakhs.




                                                                                                   Page 1 of 4
   1   2   3   4