Page 1 - mechanical.pdf
P. 1
MECHANICAL
(Carriage & Wagon)
1. As per Hqrs instructions, three COVID-19 isolation rakes were made ready at
Kacheguda depot and stabled at UR, SHNR & MED stations.
Mosquito net was provided for all the Hand showers & long body taps are
windows. provided for bathing facility.
Oxygen cylinder bracket. Gunny bags fixed on top of the roof.
2. In the month of June, Coaching Depot/KCG has undertaken IOH for 45 coaches, the
highest ever in the last 4 years.
3. Computer based SCTR is introduced to ensure that all the stipulated tests are being
carried out without fail either intentionally or accidentally. Most of the supervisors and staff
have been imparted training on working with this computerized SCTR.
4. First Kisan Rail was maintained on 24-8-2021 with 12 VPUs at Coach Maintenance
Depot, KCG and was dispatched to Agartala in Tripura state duly transporting 284 tonnes
of onion thus generating revenue of Rs.18.3 Lakhs.
Page 1 of 4