Analysis of power factor using Power analyzer at various pumping installations.

           A special drive conducted to study and analyze the effect of pumping load on power factor of
            the system using power analyzer. Initially analyzed various parameters of GLR pump house at
            Rail Nilayam which is having 2 x 15 HP centrifugal pumps and 1 x 10 HP mono block pump and
            caters water supply requirement of RN building and colony area.
           From  the  analysis,  to  improve  Power  Factor,  10  KVAR  capacitor  has  been  provided  for
            compensation.
           Drive for Thermal Imaging for identification of hotspots in panels is also started from 28.04.2020












                                            Thermal imaging for identification of Hot spots.

           3-Way  RMU  is  commissioned  at  Laundry  Substation  at
            Kacheguda Station.
            The details of RMU are as follows.
            Make: ABB
            No. of VCBs: 03
            Capacity: 630A
            No. of inputs: 01 - Connected to Incoming Supply.
            No. of outputs:  02 - Connected to TR1 & TR2.


           70Nos. of 150W LED lights provided for yard portal lighting                                         at
            KCG Yard by Construction/SC. This resulted in increase in
            connected load of 10.50kW at KCG.