Analysis of power factor using Power analyzer at various pumping installations.
A special drive conducted to study and analyze the effect of pumping load on power factor of
the system using power analyzer. Initially analyzed various parameters of GLR pump house at
Rail Nilayam which is having 2 x 15 HP centrifugal pumps and 1 x 10 HP mono block pump and
caters water supply requirement of RN building and colony area.
From the analysis, to improve Power Factor, 10 KVAR capacitor has been provided for
compensation.
Drive for Thermal Imaging for identification of hotspots in panels is also started from 28.04.2020
Thermal imaging for identification of Hot spots.
3-Way RMU is commissioned at Laundry Substation at
Kacheguda Station.
The details of RMU are as follows.
Make: ABB
No. of VCBs: 03
Capacity: 630A
No. of inputs: 01 - Connected to Incoming Supply.
No. of outputs: 02 - Connected to TR1 & TR2.
70Nos. of 150W LED lights provided for yard portal lighting at
KCG Yard by Construction/SC. This resulted in increase in
connected load of 10.50kW at KCG.