Page 2 - A H - S and T
P. 2

3.   Existing 08 Mechanically Operated Lifting barrier (MOLB)at interlocked LC gates
                    replaced  with  Electrically  Operated  Lifting  barrier  (EOLB)  at  LC 68, LC.2/MLY,
                    LC27, LC28, LC47, LC145, LC155 & LC 189A In overall 25 LC gates out of total
                    interlocked 78 LC gates have  been completed.

















                                Replacement of Mechanically Operated Lifting Barrier with EOLB

               4.   Emergency standby Sliding Boom Barriers provided at 10 interlocked LC gates.
                    In  overall,  68  interlocked  LC gates  have  been  provided  with  sliding  booms  out of
                    total 78 interlocked LC gates in the division.













                                   Provision of Emergency Standby sliding boom barriers


               5.   In  connection  with  proposed  Doubling  between  Umdanagar-Mahbubngar
                    section,  doubling  work  between  Shadnagar  to  Gollapali  stations  under  Stage-1
                    commissioned with following features:


                       a)  SHNR,  BABR  &  GLY  stations  have  been  provided  with  Centralized
                          Electronic Interlocking of M/s Medha Servo Drives Ltd.















                                          Provision of Centralized Electronic interlocking at SHNR, BABR, GLY





                                                            50