3. Existing 08 Mechanically Operated Lifting barrier (MOLB)at interlocked LC gates
replaced with Electrically Operated Lifting barrier (EOLB) at LC 68, LC.2/MLY,
LC27, LC28, LC47, LC145, LC155 & LC 189A In overall 25 LC gates out of total
interlocked 78 LC gates have been completed.
Replacement of Mechanically Operated Lifting Barrier with EOLB
4. Emergency standby Sliding Boom Barriers provided at 10 interlocked LC gates.
In overall, 68 interlocked LC gates have been provided with sliding booms out of
total 78 interlocked LC gates in the division.
Provision of Emergency Standby sliding boom barriers
5. In connection with proposed Doubling between Umdanagar-Mahbubngar
section, doubling work between Shadnagar to Gollapali stations under Stage-1
commissioned with following features:
a) SHNR, BABR & GLY stations have been provided with Centralized
Electronic Interlocking of M/s Medha Servo Drives Ltd.
Provision of Centralized Electronic interlocking at SHNR, BABR, GLY