Page 9 - A H - S and T
P. 9

11.  On 14.09.2020, 02 No. of Double line Single Faced (DLSB) Train Indication Boards
                   (one  per  station)  of  M/s  Surya  Electronics  have  been  installed  &  commissioned  at
                   concourse of BABR & GLY Stations by M/s Surya Electronics, through RVNL.














                                              Train Indication Boards at BABR station

               12.  CCTV,  Telephone  Connections  (Railway,  FCT  &  BSNL)  &  Wi-Fi  facilities  were
                    provided in COVID-19 Isolation wards at Central Railway Hospital/LGD.

               13.  35  Nos.  of  CCTV  IP  Cameras  (15  Nos.  of  Dome  &  20  Nos.  of  Bullet
                    Cameras)  have  been  installed  in  Rail  Nilayam  Building  and  premises
                    with  64  Channel  NVR  and  one  No.  of  55”  Display  installed  at  Zonal
                    Security Control Room.

               14.  44  BSNL  Landline  connections  of  Offices  /  Residence  of  Officers  over
                    Hyderabad  Division  have  been  surrendered,  savings  of  Rs.10,000/-  (approx.)  per
                    month.

               15.  NTES  Integration  of  IPIS  System  on  Railnet  has  been  done  at  VAR,
                    FM,  SHNR,  BABR,  JCL,  GLY,  GWD,  MBNR,  KRNT,  MJF,  BMO,  MED,
                    KMC, NZB, DAB & UMRI stations.
















                                                 NTES integration of IPIS system



               16. On     09.09.2020,     IP    Based     Unified     Communication        Exchange       has
                      been    commissioned      at    Hyderabad      Bhavan     (Make:     Tadiran,    Model:
                      AEONIX IP Server, No. of Ports: 300 and 40 IP endpoint licenses).







                                                            57
   4   5   6   7   8   9   10