Page 4 - RASSoW08Q - Roll-on Roll-off (RO-RO) Lorry Operations
P. 4
Mid UK Recycling Driver Risk Assessment & Safe System of Work
Section 1 Risk Index Section 2 Section 3 Section 4 Risk Index
Description of the hazards Without What/ Who Arrangements required to adequately Person responsible for implementing With Control
and risks Control is at risk control the risk and monitoring the controls Measures
S x P = RI S x P = RI
General awareness of underfoot
Slips, Trips and Falls conditions. Driver to check and monitor The Driver, Fleet General Manager and
Drivers
their surroundings areas. Ensure safety Transport Manager to ensure only
Other Road footwear is in good condition and relevant trained drivers operate skip vehicles
3 3 M Users to the work taking place. Pedestrian and skip trailers. 3 1 L
Pedestrians walkways are inspected daily by H&S. Spill
Cyclist kits to be in high-risk areas. Walkways to When collecting/delivering/loading or
VRU’s be cleaned as part of the daily workshop unloading skips, please be mindful of
uneven ground.
cleaning routine.
(Personal Protective 5 pieces of PPE to be always worn by all. The Driver, Fleet General Manager and
Drivers
Equipment) PPE This includes: Transport Manager to ensure only
3 4 H Other Road 1. High viability vest or jacket trained drivers operate skip vehicles 3 1 L
Users 2. Safety boots and skip trailers.
Pedestrians 3. Hard Hat
Cyclist 4. Gloves Managers to ensure that the Beauparc
VRU’s 5. Glasses. PPE signs are displayed in and around
the workplace areas of all employees.
Signs are also shown in specific areas on
sites explaining what additional PPE is to
also be worn by all individuals.
PLEASE ALSO WEAR YOUR PPE IN THE
TRANSPORT YARD
HSF18
Drivers have a responsibility to themselves
First Aid / Cuts & Abrasions The Driver, Fleet General Manager and
Drivers and others, and all injuries are to be Transport Manager to ensure only RASSoW08Q
reported to the transport office and or the
3 4 H Other Road responsible person on the site. trained drivers operate skip vehicles 3 1 L RO-RO Lorry Operations
Users and skip trailers.
Pedestrians
An incident should also be reported via REPORT ALL CUTS & ABRASIONS to
Cyclist
your Assure app portal. your Manager. Review Dates:
VRU’s
(V5) – 06-09-2023 / Next R/D 05-09-2024
Review by FORS Practitioner - Steve Bennett
Approved by General Manager – Fred Flatters