Page 6 - RASSoW08Q - Roll-on Roll-off (RO-RO) Lorry Operations
P. 6

Mid UK Recycling       Driver Risk Assessment & Safe System of Work

            Section 1           Risk Index  Section 2                Section 3                           Section 4              Risk Index

     Description of the hazards   Without   What/ Who    Arrangements required to adequately   Person responsible for implementing   With Control
            and risks            Control     is at risk           control the risk               and monitoring the controls     Measures


                               S x P =  RI                                                                                      S x P =  RI

    Safe Unloading & Restraints                        All drivers are to be aware of obstructions   The Driver, General Manager and
                                           Drivers
                                                       within the unloading area. IF any persons   Transport Manager to ensure only
                                           Other Road   or animals come into the driver's area of   trained drivers operate skip vehicles.
                               3   4   H   Users       unloading then they must stop what they                                  3   1    L
                                           Pedestrians  are doing until it is safe to continue. Bin
                                           Cyclist     nets are only to be removed when the Bin
                                           VRU’s       is on the floor and OFF the RO-RO vehicle.




     RO-RO Bins in Transit on                          All drivers are to ensure that they
      the Highway / Bungee                 Drivers     make the bins safe prior to travelling   The Driver, General Manager and
              Cord                                     on the public highway. All bins WILL   Transport Manager to ensure only
                                           Other Road  have a net over the top of an open bin   trained drivers operate skip vehicles.
                                           Users       and the net will be secured to the
                               3   4   H   Pedestrians  vehicle body with bungee cord. All                                      3   1    L
                                           Cyclist
                                           VRU’s       buggee cord is to be inspected by the
                                                       driver and any frayed bungee is to be
                                                       exchanged.

         RO-RO Controls:                               UNDER ABSOULTLY NO
                                           Drivers                                          The Driver, General Manager and
                                                       CIRCUMSTANCES ARE ANY ITEMS TO
                                           Other Road   BE USED TO JAM LEVERS INTO AN       Transport Manager to ensure only                                                           HSF18
                                           Users       OPERATIONAL STATE. This also         trained drivers operate skip vehicles.
                               4   3   H   Pedestrians  includes placing any form of weighted  Managers are to remind and revise the   4  2  M                                 RASSoW08Q
                                           Cyclist                                                                                                                         RO-RO Lorry Operations
                                           VRU’s       item onto the acceleration pedal to   drivers to the dangers of jamming
                                                       increase the engine revs whilst the   control to operate a skip and encourage
                                                       PTO has been engaged.                defect reporting.
                                                                                                                                                                                   Review Dates:
                                                                                                                                                             (V5) – 06-09-2023 / Next R/D 05-09-2024
                                                                                                                                                           Review by FORS Practitioner - Steve Bennett
                                                                                                                                                         Approved by General Manager – Fred Flatters
   1   2   3   4   5   6   7   8   9   10   11