Page 2 - Mountain Transport - Tipper Operations
P. 2
Mid UK Recycling Driver Risk Assessment & Safe System of Work
PART 1 – RISK ASSESSMENT – Tipper Operations (Rigid and Articulated Vehicle)
RA/SSOW NUMBER Risk Assessment & Safe System of Work. 11Q REVISION No. 002
TITLE Tipper Operations (Rigid and Articulated Vehicle)
DESCRIPTION OF TASK The Operating Procedures for a Tipper Vehicles. Rigid and articulated.
LOCATION Mountain Transport, London Road, Quarrington, Sleaford, Lincolnshire, NG34 8NX – Tel 01529 304 308
ASSESSMENT TEAM Mr Liam O’Brien Mr Ian Rogers Mr Rick Legg Mr Steve Bennett Miss Klaudia Pilat
(List all people involved) Group Head of Fleet Compliance General Manager Driver Trainer H&S Advisor
Fleet Manager.
Date of Initial Assessment 01/12/2020 Next Review Date 05/01/2026
Steve Bennett / Rick Legg / Shared file with
Reviewed Date: 06/01/2025 Reviewed By:
H&S
Key: S = Severity P = Probability RI = Risk Index S x P = RI Risk Index
RASSoW 11Q
Severity Description Probability (how likely is the occurrence) P 1 2 3 4 5
S Tipper Operations
1 No damage / no injury 1 Practically impossible / highly unlikely 5 5 10 15 20 25
2 Damage to plant / damage to environment / no injury 2 Not likely but small chance of happening 4 4 8 12 16 20
3 Minor injury / illness (occupational) 3 Possible 3 3 6 9 12 15
4 Major injury / illness (occupational) 4 Likely therefore assume can happen 2 2 4 6 8 10 Review Dates:
5 Fatality 5 Very likely therefore assume will happen 1 1 2 3 4 5 (V2) – 06-01-2025 / Next R/D 05-01-2026
Review by Steve Bennett
Approved by General Manager – Rick Legg