Page 12 - Mountain Transport - RO-RO Lorry Operations
P. 12
Mid UK Recycling Driver Risk Assessment & Safe System of Work
Section 1 Risk Index Section 2 Section 3 Section 4 Risk Index
Description of the hazards Without What/ Who Arrangements required to adequately Person responsible for implementing With
and risks Control is at risk control the risk and monitoring the controls Control
Measures
S x P = RI S x P = RI
Safe delivery and Drivers are to keep to the road speed limit
collection of a Bin/Compactor listed in the highway code book (Issued)
Drivers The Driver, General Manager and
whilst on route to a customer. Take your
Other Road time on arrival to a delivery and conduct Transport Manager to ensure only
trained drivers operate the articulated
2 3 L Users you site risk assessment on arrival. See vehicles with a walking floor. 2 2 L
Pedestrians slide 23. Always take good observations
Cyclist around your vehicle and ensure the area is
VRU’s safe before, during and after your duty.
Safe Operation of All drivers are to be aware of the operating
Compactors procedures for the compactor machines The Driver, General Manager and
they use. If a driver is unfamiliar with the Transport Manager to ensure only
Drivers compactor, he/she is to contact the trained drivers operate the articulated
transport office and inform the transport vehicles with a walking floor trailer.
2 3 L Other Road staff that they do not know how to use this 2 1 L
Users machine. The Transport office will contact Drivers should also sign the RASSoW to
Pedestrians the company for a member of staff to ensure they understand the procedure
Cyclist come and assist the driver. and policy.
VRU’s
Driver Handbook
Drivers Drivers Must ensure that they comply to The Driver, General Manager and
the rules listed in the driver’s Safe System Transport Manager to ensure only
1 3 L Other Road of Work (SSoW) listed below and the trained drivers operate the articulated 1 2 L RASSoW 08Q
Users procedures in the driver's handbook. vehicles with a walking floor.
Pedestrians See the QR code left. RO-RO Lorry Operations
Cyclist
VRU’s
Review Dates:
(V2) – 06-01-2025 / Next R/D 05-01-2026
Review by Steve Bennett
Approved by General Manager – Rick Legg