Page 2 - Mountain Transport - RO-RO Lorry Operations
P. 2

Mid UK Recycling       Driver Risk Assessment & Safe System of Work



                            PART 1 – RISK ASSESSMENT – Roll-on Roll-off (RO-RO) Lorry Operations




         RA/SSOW NUMBER            Risk Assessment & Safe System of Work-08Q                                            REVISION No. 02



                TITLE              RO-RO Lorry Operations



        DESCRIPTION OF TASK        The operation of a RO-RO lorry including loading, unloading, tipping, exchanging, netting and un-netting procedures. The
                                   stacking of RO-RO bins, using a torque wrench and company policies and procedures.



             LOCATION              Mountain Transport, London Road, Quarrington, Sleaford, Lincolnshire, NG34 8NX – Tel 01529 304 308



         ASSESSMENT TEAM             Mr Liam O’Brien        Mr Ian Rogers       Mr Fred Flatters        Mr Craig Howes         Miss Klaudia Pilat
                                                          Fleet Compliance
       (List all people involved)   Group Head of Fleet                         General Manager        Transport Planner          H&S Advisor
                                                              Manager.


      Date of Initial Assessment   01/12/2020                                 Next Review Date      05/01/2026



           Reviewed Date:          06/01/2025                                 Reviewed By:          Steve Bennett / Rick Legg / Shared file with H&S

                                                                                                                                                                               RASSoW 08Q
         Key:       S = Severity                 P = Probability                 RI = Risk Index                S x P = RI  Risk Index
                                                                                                                                                               RO-RO Lorry Operations
                   Severity Description              Probability (how likely is the occurrence)  P  1  2  3  4  5
                                                                                   S
   1  No damage / no injury                     1  Practically impossible / highly unlikely  5  5  10  15  20  25
   2  Damage to plant / damage to environment / no injury  2  Not likely but small chance of happening  4  4  8  12  16  20
                                                                                                                                                                                   Review Dates:
   3  Minor injury / illness (occupational)     3  Possible                         3   3    6   9   12   15
                                                                                                                                                             (V2) – 06-01-2025 / Next R/D 05-01-2026
   4  Major injury / illness (occupational)     4  Likely therefore assume can happen  2  2  4   6    8   10                                                              Review by Steve Bennett
   5  Fatality                                  5  Very likely therefore assume will happen  1  1  2  3  4  5                                               Approved by General Manager – Rick Legg
   1   2   3   4   5   6   7