Page 5 - Mountain Transport - RO-RO Lorry Operations
P. 5
Mid UK Recycling Driver Risk Assessment & Safe System of Work
Section 1 Risk Index Section 2 Section 3 Section 4 Risk Index
Description of the hazards Without What/ Who Arrangements required to adequately Person responsible for implementing With Control
and risks Control is at risk control the risk and monitoring the controls Measures
S x P = RI S x P = RI
General awareness of underfoot
Slips, Trips and Falls conditions. Driver to check and monitor The Driver, Fleet General Manager and
Drivers
their surroundings areas. Ensure safety Transport Manager to ensure only
Other Road footwear is in good condition and relevant trained drivers operate skip vehicles
3 3 M Users to the work taking place. Pedestrian and skip trailers. 3 1 L
Pedestrians walkways are inspected daily by H&S. Spill
Cyclist kits to be in high-risk areas. Walkways to When collecting/delivering/loading or
VRU’s be cleaned as part of the daily workshop unloading skips, please be mindful of
uneven ground.
cleaning routine.
(Personal Protective 5 pieces of PPE to be always worn by all. The Driver, Fleet General Manager and
Equipment) PPE Drivers This includes: Transport Manager to ensure only
3 4 H Other Road 1. High viability vest or jacket trained drivers operate skip vehicles 3 1 L
Users 2. Safety boots and skip trailers.
Pedestrians 3. Hard Hat
Managers to ensure that the Beauparc
Cyclist 4. Gloves
PPE signs are displayed in and around
VRU’s 5. Glasses.
Signs are also shown in specific areas on the workplace areas of all employees.
sites explaining what additional PPE is to
also be worn by all individuals.
PLEASE ALSO WEAR YOUR PPE IN THE
TRANSPORT YARD
Drivers have a responsibility to themselves RASSoW 08Q
First Aid / Cuts & Abrasions The Driver, Fleet General Manager and
Drivers and others, and all injuries are to be Transport Manager to ensure only
reported to the transport office and or the RO-RO Lorry Operations
3 4 H Other Road responsible person on the site. trained drivers operate skip vehicles 3 1 L
Users and skip trailers.
Pedestrians An incident should also be reported via
Cyclist REPORT ALL CUTS & ABRASIONS to
your Assure app portal. your Manager. Review Dates:
VRU’s
(V2) – 06-01-2025 / Next R/D 05-01-2026
Review by Steve Bennett
Approved by General Manager – Rick Legg