Page 2 - Mountain Transport - Safe loading and Load Restraint
P. 2

Mid UK Recycling       Driver Risk Assessment & Safe System of Work


                                  PART 1 – RISK ASSESSMENT – Safe Loading & Load Restraint




           RA NUMBER            Risk Assessment (RA) - 42Q                                                                                        REVISION No. 02


              TITLE             Safe Loading and Load Restraints for all Mid UK Vehicles.


                                Whilst operating a company vehicle drivers are reminded that it's important to ensure that the centre of gravity is kept
      DESCRIPTION OF TASK       as low as possible, and that the vehicle is loaded secured safely with the correct type of fixing or lashing strap and in the
                                instance of loading plant equipment which can be very heavy the use of chocks should be used.

            LOCATION            Mountain Transport, London Road, Quarrington, Sleaford, Lincolnshire, NG34 8NX – Tel 01529 304 308



       ASSESSMENT TEAM           Mr Liam O’Brien    Mr Ian Rogers        Mr Rick Legg       Mr Steve Bennett         Miss Klaudia Pilat
     (List all people involved)   Group Head of    Fleet Compliance    General Manager.      Driver Trainer.           H&S Advisor.
                                      Fleet.          Manager.

     Date of Initial Assessment  01/12/2020                         Next Review Date       05/01/2026




         Reviewed Date:         05/01/2024                          Reviewed By:           Steve Bennett / Rick Legg / Shared file with H&S



                                                                                                                                                                                RA-013Q
          Key:       S = Severity                 P = Probability                 RI = Risk Index                S x P = RI  Risk Index                              Safe Loading & Load
                                                                                                                                                                                   Restraint
                    Severity Description              Probability (how likely is the occurrence)  P  1  2  3  4  5
                                                                                    S
    1  No damage / no injury                     1  Practically impossible / highly unlikely  5  5  10  15  20  25
    2  Damage to plant / damage to environment / no injury  2  Not likely but small chance of happening  4  4  8  12  16  20
    3  Minor injury / illness (occupational)     3  Possible                        3    3   6    9   12   15
                                                                                                                                                                                   Review Dates:
    4  Major injury / illness (occupational)     4  Likely therefore assume can happen  2  2  4   6    8   10                                                (V2) – 06-01-2025 / Next R/D 05-01-2026
    5  Fatality                                  5  Very likely therefore assume will happen  1  1  2  3  4  5                                                            Review by Steve Bennett
                                                                                                                                                            Approved by General Manager – Rick Legg
   1   2   3   4   5   6   7