Page 59 - Mid UK Driver Handbook
P. 59
Once ready the driver will inform The Site Manager at Clover Nook
Driver the loader he is ready to load the is to oversee & monitor then
5 4 20 & Plant vehicle. implement this procedure 5 2 10
During the loading
Operator The driver is to remain in his between Mid UK Driver & the
Clover Nook Operatives.
vehicle during the loading. If for
ANY reason the driver needs to
leave the truck he is to inform the
loader via the two way radio.
The loader will inform the LGV The Site Manager at Clover Nook
On completion of Driver driver loading has been completed is to oversee & monitor then
loading the truck 5 4 20 & Plant via the radio. The driver may now implement this procedure 5 2 10
Operator leave the truck and prepare the between Mid UK Driver & the
vehicle for leaving site. Clover Nook Operatives.
Step 1—The driver to stop and ensure its safe to move onto site.
Step 2—The driver to STOP on weighbridge, and book into the site. Receive site induction.
Step 3—The driver to drive to the safe area for preparing the vehicle for loading.
Step 4—The driver is to STOP here prepare the vehicle for loading using his Mid UK Recycling RASSoW.
Step 5—The loader WILL call the vehicle into the loading bay for loading.
COMMUNICATION
5 4
3
3
2 1
59