Page 55 - Mountain Transport - Skip Operations
P. 55
Mid UK Recycling Driver Risk Assessment & Safe System of Work
Skip Storage:
14 & 16 Yard Skips
The 14 & 16 -yard enclosed skip
cannot be stacked. They must
remain single
The 14-yard open skip may be
stacked 2 skips high.
RASSoW 09Q
Skip Lorry Operations
When connecting or disconnecting the chains the driver must
ensure that each eye hook is correctly connected to the lug of
the skip so to prevent the chain from swinging off its lug and Review Dates:
(V2) – 06-01-2025 / Next R/D 05-01-2026
hitting either a driver or a passing person. Review by Steve Bennett
Approved by General Manager – Rick Legg