Page 77 - AFCAT Solved Papers 2011 - 2019 SSBCrack eBook
P. 77

51.  (b) Here, Speed of man = 4.5 km/hr               55.  (c) According to question,
                      Speed of current = 1.5 km/hr
                      \ Speed of man in downstream = (4.5 + 1.5) = 6km/hr   (A + B)'s 1 day's work =   1
                      Speed of man in upstream = (4.5 – 1.5) = 3km/hr                          12
                                          ´
                                       ´
                                      2 6 3                                                     1
                      \ Average speed =                                     (B + C)'s 1 day's work =
                                         +
                                       (6 3)                                                   15
                         ´
                            ´
                        2 6 3                                                                   1
                      =         = 4 km/hr                                   (A + C)'s 1 day's work =
                          9                                                                     20
             52.  (d) Let the number of boys and girls be 3x and 2x.
                      Number of those who are not scholarship holders                                æ  1  +  1  +  1 ö
                                                                            \  (A + B) + (B + C) + (A + C) =  ç  12 15  20 ø  ÷
                        æ    80       70 ö   æ  12x  7x ö  19x                                       è
                      = ç  3x´  +  2x´  ÷  Þ    ç  +  ÷  =
                        è   100      100 ø   è  5   5 ø   5                                 5 4 3 ö  + æ  +  æ  12 ö  æ  1 ö
                                                                            \    2 (A + B + C) =  ç  60  ÷  = ç  60 ø  ÷  = ç  5 ø  ÷
                                           æ  19x    ö                                     è       ø  è     è
                      \   Required percentage = ç  ´ 100 ÷
                                             ´
                                           è  5 5x   ø                                                1
                                          = 76%                             \  (A + B + C)'s 1 day's work =   10
             53.  (a) Ratio of times by A and B = 1 : 3
                      The time difference is (3 – 1) = 2 days while B takes 3  \  A, B and C together can do the work in 10 days.
                      days and A takes 1 day.                      56.  (d) Let number be x, then
                      If difference of time is 2 days, B takes 3 days
                                                                            x +  æ  ç  x 40 ö  ´  ÷  -  x =  56
                                                  æ  3  ö                      è  100 ø
                      If difference of time is 40 days, B takes ç  ´  40 ÷  = 60 days
                                                  è  2  ø
                      So, A takes 20 days to do the work.                   x +  2x  -  x =  56
                                                                                5
                                      1
                      A's 1 day's work =
                                     20                                     2x  =  56
                                                                             5
                                     1
                      B's 1 day's work =
                                     60                                           56 5
                                                                                    ´
                                                                            \   x =    =  140
                                         æ  1  1 ö  æ  3 1ö  +                      2
                      (A + B)'s 1 day's work = ç  +  ÷  =  ç  ÷
                                         è  20  60 ø  è  60 ø      57.  (a) Total weight increase by = 15 × 1.5 = 22.5 kg
                                                                            \ Weight of new man = 40 + 22.5 = 62.5 kg
                        4   1
                      =   =                                        58.  (c) Let temperature of tuesday = a, temperature of
                       60   15
                                                                            wednesday = b and temperature of thursday = c
                      \    A and B together can do the work in 15 days.     Sum of temperatures of tuesday to thursday = 38 × 3
                                                   5                        =114
             54.  (b) Speed of 1st train = 90 km/hr =  90´  =  25 m/sec
                                                  18                        \  a + b + c = 114
                      Time taken by 1st train = 36 seconds                  Sum of temperatures of wednesday to friday = 37 × 3
                      \ Distance = speed × time                             = 111
                                = 25 × 36 = 900m                            b + c + friday = 111
                      Now                                                   \ Temperature of friday = 39
                      2nd train is 100 meters shorter, then                 \ b + c + 39 = 111
                      \ Distance (900 – 100) = 800m                         \ b + c = (111– 39) = 72
                                           5                                \ a + b + c = 114
                      Speed of 2nd train =  45´  =  12.5 m/sec
                                          18                                a + 72 = 114
                                                                            \  a = (114 – 72) = 42
                               800
                      \ Time =     =  64 seconds.                           \  Temperature on tuesday = 42°C
                              12.5
   72   73   74   75   76   77   78   79   80   81   82