Page 6 - GMP for warehouse
P. 6
GMP Training – GMP for Warehouse by www.gmpsop.com
Chapter 5
Production
5.5. Incoming materials and finished products should be physically or
administratively quarantined immediately after receipt or processing, until they
have been released for use or distribution.
Finished products
5.58. Finished products should be held in quarantine until their final release
under conditions established by the manufacturer.
Overview:
A pharmaceutical warehouse must be expertly managed and run in compliance
in order for the company to protect and distribute a quality product.
These compliant practices include control over receiving goods, quality control,
storing materials, components and products, fulfilling picking requests and
shipping the product to the marketplace. These practices must be completely
traceable in order to protect the integrity and stability of the product and its
packaging.
GMP rules for the warehouse enable manufacturers to:
protect medicines from damage during storage and transport
prevent degradation of the product by exposure to adverse temperature
conditions
avoid mix-ups and contamination by other materials
maintain product identity and traceability
prevent time-expired or damaged material or product from being used
What comes into the warehouse?
Copyright©www.gmpsop.com. All rights reserved
Unauthorized copying, publishing, transmission and distribution of any part of the content by electronic means are strictly prohibited.
Page 6 of 64