Page 48 - VCC 2022 Capital Plan New
P. 48
PHASE ONE - PARKING LOT
The existing paved parking surface at the Valdosta Country Club was observed to exhibit cracking and
localized failure in multiple locations due to wear and tear, tree roots, lack of base material, etc. After a
subsurface investigation, it was noted that a majority of the existing parking lot consists of less than 2" of
asphalt with little to no underlying base material. According to the subsurface investigation report, Parking
Lot 1 was noted to have 5 1/2 to 6" of soil cement base, with the remaining parking areas having no base
material.
The proposed parking
lot layout increases the
size of the parking
spots as well as the
drive aisles. The
construction will
include a new layer of
base material as well
as a new asphalt
course, suitable for the
anticipated traffic
flow. Additionally, the
exhibit displays all new
18" curb and gutter,
both new and
revitalized interior
islands, as well as the
addition of two new
gates at entrance/exit
locations. The
proposed layout
provides a total of 192
parking spots, with the
option of overflow
parking adjacent to
the pool area and cart
barn.