Page 19 - MKRS Ring lock User Guide Manual Blue Redesign PDF_Neat
P. 19

RINGLOCK

                       SAFETY MANUAL & USER GUIDES


                       Erection Guidelines—Step 2




            3. Place Planks of the correct
               bay length into the end bay to
               fully deck out the bay. Adjust
               the position of the Jacks and
               Base Collar by pushing one
               Jack sideways either in or out
               in order that the Planks are
               parallel with the Ledgers. Only
               a small amount of movement
               may be needed to ensure the
               bay is square enough to lock
               down the Planks with Deck
               Locks. Once you are satisfied
               that the bay is square, fill all
               other bays with Planks so that a
               platform is created from which
               the rest of the scaffold can be erected.
            4. When you are satisfied that the scaffold is fully squared and levelled, hammer in
               the wedges.

            SCAFFOLDING NOTE:
            Irrespective of whether a platform is required on the lowest rosettes it is
            recommended that the Planks are installed at this level. This ensures that the scaffold
            is square and level prior to erection and it also provides plan stiffness. This is most
            important, especially when the maximum height of the scaffold is above eight lifts.

            The installation of these Planks ensure that the out of alignment eccentricities are kept
            to a minimum in order for the scaffold to attain the maximum permissible height for
            each recommended tie pattern (refer to Technical Manual).





































            19
   14   15   16   17   18   19   20   21   22   23   24