Page 39 - MKRS Ring lock User Guide Manual Blue Redesign PDF_Neat
P. 39

RINGLOCK

                       SAFETY MANUAL & USER GUIDES


                       10 Leg Stair Tower Erection Guidelines—Steps 7 & 8



            STEP 7


            1. The third landing can be assembled by the next
               consecutive steps:
               • Place the 3.0m Standards

               • Assemble the Ledgers
               • Assemble the Braces at the two outer sides
               • Assemble the Stringers

               • Assemble the Treads from bottom to top
            ASSEMBLE THE PLANKS ON THE NEXTLANDING






















            STEP 8


            The Stair Tower is complete after the assembly of
            1.0m Standards on the third landing, Guardrails
            along the stair and on the third landing, and
            Toeboards on the third landing.

            The tower is now complete up to the third lift.
            Continue with is method until the full height of the
            Stair tower is reached.

            For notes on dismantling the Ringlock Stair Tower
            refer to dismantling guidane in the manual.























            39
   34   35   36   37   38   39   40   41   42   43   44