Continuous Flight Auger (CFA)

• Piles are bored using drilling rig of internal diameter
  allowing for casting the concrete till the required
  depth.

• Casting of concrete starts with withdrawing the
  drilling rig upwards.

• Capacity of about 100 ton.
Advantages: ease of changing lengths by cutting or

  slicing the shell. Material costs relatively low.
  Inspection possible.
Disadvantage: not feasible in hard soils or rock. Voids
  in concrete may be created. Splicing problems after
  concreting.