Page 11 - BCML AR 2019-20
P. 11
2000-2014: Integrated growth (contd.)
2006 2007
Set up a greenfield integrated Set up a greenfield integrated sugar control of its management. IGIL had a
sugar complex at Mankapur – sugar complex at Kumbhi, with a sugar sugar unit with a crushing capacity of
manufacturing capacity of 8,000 TCD, 34 crushing capacity of 8,000 TCD and 20 3,000 TCD at Maizapur. The sugar division
MW co-generation power plant and a 100- MW co-generation power plant. The co- was demerged from IGIL and merged with
KLPD distillery. The plant’s cogeneration generation facility was expanded to 32.70 BCML. During the year 2017, BCML sold its
capacity is currently 43.60 MW. MW in 2014. entire stake in IGIL after completion of the
Open Offer formalities.
Acquired an integrated sugar unit at Another greenfield integrated sugar
Rauzagaon from Dhampur Sugar Mills Ltd. complex was set up at Gularia, with
The unit (then capable of crushing 7,500 a crushing capacity of 8,000 TCD and
TCD and generating 12 MW of power) cogeneration capacity of 31.3 MW.
was expanded to 8,000 TCD; power Acquired a 53.96% stake in Indo Gulf
generation capacity was enhanced to Industries Limited (IGIL) and assumed
25.75 MW.
2015 to 2019: Caring for the environment and the shareowners
2015 2016 to 2019 2020
Invested in incinerators at the distillery for Carried out three share buyback schemes Commissioned a 160 KLPD distillery at
better environment management as well with a cumulative payout of C421.67 crore Gularia to manufacture ethanol
increased distillery operational days under the buyback
Converted the sugar manufacturing
process of Tulsipur plant having capacity
of 7000 TCD from double sulphitation to
defco remelt Phospho-floatation process.
2020 onwards
Creating the foundation for institution building
Professionally- Process- Technology-
driven driven oriented Proactive
Annual Report 2019-20 | 09