Page 14 - ECACS Ten-Year Capital Plan
P. 14

BLESSED SACRAMENT SCHOOL
ASSESSMENT CHECKLIST
Exterior Building Condition
 Foundation 5 Envelope and Cladding 5 Drainage and Roofing 5 Openings   5 Exterior Lighting 5
Interior Building Condition
Structural Elements 5 Interior Fixtures/Hardware/Furniture 5 Interior Finishes 5 Equipment   5 Millwork and Casework 5
Building Services Condition
Mechanical 5 Electrical 5 Sustainability and Efficiency 5
School Site
4.1
              Physical Space for Expansion 5 Site Drainage 3 Parking   3 Landscaping   4
 4.2
4.3 4.4 4.5
5 4.6 Sidewalks and Exterior Stairs 5
Programmatic and Functional Assessment
Adequate Instructional Area 5 Appropriate Learning Spaces 5 Adherence to Design Standards 5 Rated Capacities 5 Building Circulation 5 Accessibility 5 Code Compliance 5 Ability to Handle Current Enrollment 5 Ability to Handle Future Enrollment 5
 Outdoor Furniture and Fixtures
            14
 EAST CENTRAL CATHOLIC SCHOOLS
10-YEAR FACILITIES PLAN















































































   12   13   14   15   16