Page 13 - ECACS Ten-Year Capital Plan
P. 13
4.0
Address
Grades
Total Capacity
Net Capacity
Adjusted Enrollment (‘20-21) Current Utilization
Projected Enrollment (‘24-25) Projected Utilization
School Overview: Most areas of
following a fire. The only surviving sections of the original school are the gym and music room, which were built in 1989. Two modular classrooms were added to the school in 2016, with two additional modular classrooms and a washroom added to in 2019. Construction of a four classroom addition to the school is expected to be completed in September 2021. With the completion of the four classroom addition, the school will have an instructional area of 2851m2.
BLESSED SACRAMENT SCHOOL
1321 4 Ave Wainwright, AB
K-12
793
793
671
85%
735
93%
ENROLLMENT TRENDS
800
700
600
500
400
300
200
100
0
Blessed Sacrament School date to 2003 when the school was rebuilt
Capacity: 793 Historic Enrollment
Projected Enrollment
13
EAST CENTRAL CATHOLIC SCHOOLS
10-YEAR FACILITIES PLAN
Trend