Page 33 - ECACS Ten-Year Capital Plan
P. 33

7.0
Address
Grades
Total Capacity
Net Capacity
Adjusted Enrollment (‘20-21)
Current Utilization
Projected Enrollment (‘24-25)
Projected Utilization
THERESETTA SCHOOL
5409 47 Ave Castor, AB
K-9
199
199
69
35%
83
42%
          School Overview: Theresetta School was originally built as a two level building in 1948. Additions
to the school were completed in 1956, 1962, and 2009. The 2009 addition included a gymnasium, teaching kitchen, and multi-purpose room on the north side of the school as well as significant upgrades to the mechanical and electrical systems in the school. In 2009, the lower level of the school was decommissioned and converted to a crawlspace and the interior finishes on the upper level of the school were all upgraded. The school has an instructional area of 647m2.
ENROLLMENT TRENDS
 200 180 160 140 120 100
80 60 40 20
0
Projected Enrollment with high school program
 Capacity: 199 Historic Enrollment
                                              33
 EAST CENTRAL CATHOLIC SCHOOLS 10-YEAR FACILITIES PLAN
Trend
N





































































   31   32   33   34   35