•  Hot site = fully operational except data/staff
                       (minutes-hours).
                   •  Warm site = partially prepared for
                       operations (Days-weeks).
                   •  Cold site = basic HVAC & connections
                       (weeks-months).
                   •  Mobile site = rent vehicles (trailers,
                       expensive)
                   •  Reciprocal or mutual aid agreements = more
                       than one company share DR responsibilities.
                       Problem: both may be knocked out, no
                       security, asking another side to share
                       disaster; insurance companies don't like it
                   •  Better to have many things wrong with first
                       BCP than no flaws because then you can
                       learn from mistakes
                   •  Types of testing
                          •  Checklist = give each business a copy
                              of the plan; have them run through a
                              checklist to make sure all relevant
                              points are covered
                          •  Structured walkthrough =
                              representatives get together in a
                              meeting and review the plan
                              collectively
                          •  Simulation = practice drill
                          •  Parallel = an operational test at the
                              alternate site running parallel to
                              production (comparison test)