Page 12 - Interbay 2nd Charge Consent - Email and Docs
P. 12

ADDITIONAL SETBACK
             NEW FLOOR, TERRACE
              & PARAPET
      EXISTING TREES
      RETAINED
                            MAIN ENTRANCE RBS OFFICE & IT HUB CAR PARK CLOSEBOARDED FRONT DOOR & CANOPY NEW BAY  BUILDING FENCE (1.8M)  UNIT 5 & TERRACE ABOVE TO APARTMENTS  & GATE  LINE OF EXISTING  BUILDING BRICKWORK  (DOTTED BLACK LINE)  LIFT OVERRUN  BEYOND  ADDITIONAL LINE OF EXISTING  NEW FLOOR BUILDING ROOF PROFILE  & REAR TERRACE (DOTTED BLACK LI
         LIFT OVERRUN  BEYOND
                            NEW BAY  & TERRACE ABOVE      NEW TREE
                            FRONT DOOR & CANOPY  UNIT 1   PARKING COURTYARD  (23 SPACES)
                                           OFFICE BUILDING  BEYOND
       EXISTING TREES  RETAINED
                            NEW TREE
                       BIKE STORE  (DOTTED  APPROX.  POSITION)  PEDESTRIAN  FOOTPATH

                                                          VEHICLE &  PEDESTRIAN  GATES  & BIN STORE  Close Boarded Fence 1.8M New Boundary Treatment
             LINE OF EXISTING  BUILDING ROOF PROFILE  (DOTTED BLACK LINE)  CAR PARK & STORAGE  NEW TREES  & HEDGING  Existing Trees  Retained  Patio Patio Patio  Balcony  Bathroom  Kitchen  13.7m² Bedroom 1 PV Array (20 Panels)  Balcony Patio Living/Dining  32.7m²  Terrace  Ensuite  Store  Smoke Shaft AOV Hall  7500  Bedroom 2  Hall  11.9m²  Hall  Terrac

                                                          NEW BOUNDARY DWARF BRICK WALL (0.9M)  & RAILINGS (0.9M)  New Boundary Treatment  Close Boarded Fence 1.8M     Bedroom 1  Bedroom 1  13.8m²  11.8m² 11.5m²  Ensuite  Store  Ensuite  Bedroom 2 Bathroom  Store  12.0m²  Store  Bathroom  Plant Lift  Utility Lift Overrun  Riser  New Riser  Stairs Cleaner

                                                                      Existing Tree  Removed  (Red Dotted Line)  Bedroom 2 Kitchen  Terrace 8.7m²  Canopy  Front  Door  Hall  Living/Dining Terrace  22.8m²  Communal Main  Lobby Flat Roof  Entrance  Canopy  Living/Dining  22.8m²  Terrace  Hall  Canopy Front  Door  Terrace  Bedroom 2  Kitchen  8.7m²  New Bou
                                                          PUBLIC  FOOTPATH  Bike Store  (14 Spaces)
                                                                63     New  Tree
                                                                          Parking  Courtyard  (23 Spaces)  6000
                                                                     Existing Trees  Retained
                                                                              Bin Store 4100  6 x 1100 Litre
                                                                                   10M
                                                                           Bin Store
                                                                        6000  2 x 240  Pedestrian  Gate  Gate Automatic  8
                                                                                   6
                                                                           New  Tree  4
                                                                      New  Tree  Existing Trees  Removed  (Red Dotted Line)  Existing  Crossover  BAR SCALE  2
                                                                       New Boundary Treatment Dwarf Brick Wall 0.9M Railings Above 0.9M  Existing Kerb  (Red Dotted Line)  N  0
                            OFFICE BUILDING                    12.8m
                                                                               156
                           DATUM 9.00M
                                                                                        9
   7   8   9   10   11   12   13   14   15   16   17