Page 18 - Interbay 2nd Charge Consent - Email and Docs
P. 18

Existing Trees
                Retained
                Close Boarded Fence 1.8M
               New Boundary Treatment

                      Kitchen Bedroom 1  Patio  Patio  Patio Bedroom 1 Bedroom 2  13.8m²  11.8m²  11.5m²  8.7m²  Ensuite  Hall  Store  Bathroom  Ensuite  Kitchen  Bedroom 1  Store  Bathroom  Bedroom 2  13.7m²  Living/Dining  Patio  12.0m²  Store  Living/Dining  32.7m²  22.8m²  Bathroom  Plant  Lift  Ensuite  Store  Hall  Utility  Smoke Shaft  Riser  Comm
            Existing Tree  Removed  (Red Dotted Line)  Front  Door  Main  Entrance  Front  Door
                                                       New Boundary Treatment Close Boarded Fence 1.8M
                     New  Tree                    New  Tree
            Bike Store  (14 Spaces)
                       Disabled  Bay
                 New  Tree
                                 Parking  Courtyard  (23 Spaces)  6000


       Existing Trees  Retained                     Dropped Kerb  Refuse  3 x 1100 Litre  Bin store with separated  recycling and refuse areas


                                              Dropped Kerb  4100  Dropped Kerb  10M
                                 Disabled Disabled  Bay  Bay  Bin Store  3 x 240  Pedestrian  Gate  Automatic  Folding Gate  (clear of bin stores  & pedestrian gate)  Recycling  3 x 1100 Litre  8
                          6000
                                       New  Tree                             6
              Existing Trees  Removed  (Red Dotted Line)                     4
            New  Tree          New  Tree                                     2
                                                 Existing  Crossover      BAR SCALE
                  New Boundary Treatment  Dwarf Brick Wall 0.9M  Railings Above 0.9M  Existing Kerb  (Red Dotted Line)  N  0  15
   13   14   15   16   17   18   19   20   21   22   23