Page 18 - Interbay 2nd Charge Consent - Email and Docs
P. 18
Existing Trees
Retained
Close Boarded Fence 1.8M
New Boundary Treatment
Kitchen Bedroom 1 Patio Patio Patio Bedroom 1 Bedroom 2 13.8m² 11.8m² 11.5m² 8.7m² Ensuite Hall Store Bathroom Ensuite Kitchen Bedroom 1 Store Bathroom Bedroom 2 13.7m² Living/Dining Patio 12.0m² Store Living/Dining 32.7m² 22.8m² Bathroom Plant Lift Ensuite Store Hall Utility Smoke Shaft Riser Comm
Existing Tree Removed (Red Dotted Line) Front Door Main Entrance Front Door
New Boundary Treatment Close Boarded Fence 1.8M
New Tree New Tree
Bike Store (14 Spaces)
Disabled Bay
New Tree
Parking Courtyard (23 Spaces) 6000
Existing Trees Retained Dropped Kerb Refuse 3 x 1100 Litre Bin store with separated recycling and refuse areas
Dropped Kerb 4100 Dropped Kerb 10M
Disabled Disabled Bay Bay Bin Store 3 x 240 Pedestrian Gate Automatic Folding Gate (clear of bin stores & pedestrian gate) Recycling 3 x 1100 Litre 8
6000
New Tree 6
Existing Trees Removed (Red Dotted Line) 4
New Tree New Tree 2
Existing Crossover BAR SCALE
New Boundary Treatment Dwarf Brick Wall 0.9M Railings Above 0.9M Existing Kerb (Red Dotted Line) N 0 15