Page 23 - Interbay 2nd Charge Consent - Email and Docs
P. 23
East Elevation 1200 3 x 240 Litre bins for refuse and food waste. 1.2M Close boarded fence enclosure - Finish and colour to be agreed. Hit & miss timber door. Behind the front brick and fence boundary wall. 5M 4 3 2 C H A P M A N C L I V E S T C E T I H C R A S U S TA I NA B L I TY C O
2500
7 Sheffield Stands (14 Bike Spaces) 6000 North Elevation South Elevation 14 x Bike spaces with 7 x Sheffield bike stands, galvanised finish. Sustainable FSC Wood clad panels - Finish and colour to be agreed. Complies with secure storage as required by the Code for Sustainable Homes. 3 x 240 Litre East Elevation North Elevation Bin
Extended Front Recycle Enclosure No climb end frames with anti-vandal panels. Plan West Elevation Scale
Plan 2200 Specification:
Project Drawing Drawing No.
West Elevation
Bedroom 2 11.5m² Store 2100 Store Bedroom 2 11.5m² A - 29.08.17: Reconfigured security gates allowing clear access to bin stores. Recycling and general refuse separated within bin store. Dropped kerbs noted and bin store reinforced with brick walls/railings and
Communal Lobby metal frame.
Hall 22.8m² 22.8m² Hall
Kitchen 8.7m² Living/Dining Living/Dining Kitchen 8.7m² Revisions
Existing Tree Removed (Red Dotted Line) Front Door Main Entrance Front Door 1800
New Boundary Treatment Close Boarded Fence 1.8M East Elevation
New Tree New Tree
Bike Store (14 Spaces)
Disabled Bay
New Tree
Recycling 3 x 1100 Litre
Parking Courtyard (23 Spaces) 6000
Dropped Kerb Refuse 3 x 1100 Litre Bin store with separated recycling and refuse areas North Elevation South Elevation
Refuse 3 x 1100 Litre Sliding Doors
4100
Dropped Kerb Dropped Kerb
Disabled Bay Bin Store 3 x 240 Pedestrian Gate Automatic Folding Gate (clear of bin stores & pedestrian gate) Recycling 3 x 1100 Litre
6000
New Tree
Plan
Existing Trees Removed (Red Dotted Line) West Elevation
New Tree New Tree
Existing Crossover 3 x 1100 Litre bins grouped separately for recycling. 1.8M Brick wall & railings to sides, with close boarded Sliding hit and miss timber doors hung on metal PPC
New Boundary Treatment Dwarf Brick Wall 0.9M Railings Above 0.9M Existing Kerb (Red Dotted Line) Extended Front Recycle Enclosure Specification: 3 x 1100 Litre bins grouped separately for refuse. fence to rear - Finish and colour to be agreed. frame - Colour to be agreed. 19