MIX PROPORTION
LASTON LAPIS AUS (AC~WC)
Satker : Pelaksanaan Jalan Nasional Wilayah I Provinsi Jambi
Paket : Preservasi Jalan Sp. Tuan - Bts. Kab. Muaro Jambi - Sp. Tiga Batara Gas Plant
: (Pematang Lumut) - Kuala Tungkal dan Jalan Dalam Kota Kuala Tungkal.
Penyedia Jasa : PT. Abun Sendi
Konsultan : PT. Progresia Aditya Pratama KSO. PT. Guteg Harindo
Average Coefisient
Bulk
Mix Apparent Spesific Bulk Eff
Proportio Spesific Spesific Gravity Sp. Gr Sp. Gr
Materials n Gravity Gravity B + C A A
Oven Dry
2 B D
A B C D E F
Hot Bin I 40.00 2.533 2.625 2.579 15.79 15.51
Hot Bin II 21.00 2.550 2.613 2.581 8.24 8.14
Hot Bin III 27.00 2.589 2.640 2.614 10.43 10.33
Hot Bin IV 10.00 2.577 2.623 2.600 3.88 3.85
Filler 2.00 3.150 3.150 3.150 0.63 0.63
Total 100.00 38.97 38.45
Gsb Gse
2.566 2.601
100 x ( Gse - Gsb )
Pba = x Berat jenis Aspal
Gsb x Gse
100 x ( 2,601 - 2,566 )
Pba = 2,566 x 2,601 x 1,030
3.45
Pba = x 1,030
6.67
Pba = 0.532
PENYEDIA JASA : KONSULTAN : BINA MARGA :
RAHMAT RIDUAN HARUN ARONI
Quality Control Lab Technician Nip. 196608222006041003