03. TUN RAZAK EXCHANGE 2017-2022
Skin wall construction to
contiguous bored pile (CBP) wall.
Diamond cutting on concrete
beam and slab.
Hammer drilling and setting
starter bar.
Pressure grouting on column, slab
and wall for rectification works.
04. PARADIGM MALL JOHOR 2015-2018
BAHRU
Demolish by cutting and
removing reinforced concrete
beam.
Diamond wire saw on reinforced
concrete and beam.
Diamond coring on wall and
slab.
Hammer drilling and setting
starter bar.
Diamond stitch coring for
opening.