03. TUN RAZAK EXCHANGE                                                      2017-2022






                                                                Skin     wall     construction       to
                                                                contiguous bored pile (CBP) wall.
                                                                Diamond  cutting  on  concrete
                                                                beam and slab.
                                                                Hammer       drilling   and     setting
                                                                starter bar.
                                                                Pressure grouting on column, slab
                                                                and wall for rectification works.











             04. PARADIGM MALL JOHOR                                                       2015-2018
                    BAHRU


                  Demolish      by     cutting    and
                  removing  reinforced  concrete
                  beam.
                  Diamond wire saw on reinforced
                  concrete and beam.
                  Diamond  coring  on  wall  and
                  slab.
                  Hammer  drilling  and  setting
                  starter bar.
                  Diamond      stitch    coring    for
                  opening.