MUDAJAYA GROUP
BERHAD
01. LRT 3 - GS01 2020 - PRESENT
Scanning and drilling at the pile
cap for the installation of M24
temporary support.
Demolishing the top column using
the hacking method.
Diamond stitch coring to create
openings.
Pressure grouting at the soffit slab
portal beam.
02. MRT SSP LINE (PACKAGE V207) 2019-2022
Diamond coring on walls, slabs,
and slopes.
Hammer drilling and setting of
starter bars.
Pressure grouting inside tunnels
for rectification works.
Polyurethane (PU) injection to
address water leakage.