MUDAJAYA GROUP

                                                                  BERHAD











             01. LRT 3 - GS01                                                   2020 - PRESENT



                                                              Scanning  and  drilling  at  the  pile
                                                              cap  for  the  installation  of  M24
                                                              temporary support.
                                                              Demolishing the top column using
                                                              the hacking method.
                                                              Diamond  stitch  coring  to  create
                                                              openings.
                                                              Pressure grouting at the soffit slab
                                                              portal beam.









             02. MRT SSP LINE (PACKAGE V207)                                                2019-2022



                Diamond  coring  on  walls,  slabs,
                and slopes.
                Hammer  drilling  and  setting  of
                starter bars.
                Pressure  grouting  inside  tunnels
                for rectification works.
                Polyurethane  (PU)  injection  to
                address water leakage.