Page 88 - eBook Projek Pelajar.cdr
P. 88
34
APPENDIX B: COST/ PROFIT MARGIN/ SELLING PRICE ANALYSIS
NO ITEM QUANTITY PRICE
1. Wheel (4 inch) 4 RM 14.00
2. Office Drawer Box 1 RM 79.00
3. Plywood 2 RM 30.00
4. Office chair 1 RM 100.00
5. Hollow steel 10 RM 60.00
6. Spray 6 RM 42.00
8. Welding MIG 35 RM 100.00
TOTAL RM 425.00
APPENDIX C: TABLE OF INDI VIDUAL DUTIES BY PRO JECT SCOPER
CHAPTER 6 Matric Number Name Division of Project Weighting
No Scope
1 13DAD18F1142 AHMAD RAZIF HUSIN BIN Design and At least 3 references
MUKHSAN manufacture portable are read and applied in
wheels the proposal paper
2 13DAD18F1034 WAN PUTERA AMIZAN Design and At least 3 references
BIN WAN SALLEH manufacture portable are read and applied in
hydraulics the proposal paper
3 13DAD18F1014 MUHAMMAD FAIZUDDIN Design and At least 3 references
BIN DAUD manufacture a portable are read and applied in
toolbox project to work the proposal paper
well and smoothly
4 13DAD18F1138 MUHAMAD AIZAT BIN Designing and At least 3 references
ABD AZIZ manufacture chairs are read and applied in
connected to the the proposal paper
portable toolbox
34