Obras Hidráulicas Saneamiento Hydraulic Works Sanitation




















                                                               Other works executed for SEDAPAL were:


                                                               “Expansion of Public Drinking Water and Sewerage Networks
                                                               through  Condominial  Systems  in  various  districts  of Lima,
                                                               Package 2B-1”.  This  project  was funded by the  World
                                                               Bank through an IBRD loan, and involved the installation of
                                                               water pipelines  and condominial  branches, drinking  water
                                                               household connections, sewerage pipelines and condominial
                                                               branches, and sewerage household connections.

                                                               “Installation of Public Drinking Water and Sewerage Systems
                                                               for  Lomas  de  Zapallal  Scheme in  Puente  Piedra district”.
                                                               General works involved  the improvement of three  existing
                                                               wells,  treated  water  pipelines,  discharge  pipelines,  three
                                                               reservoirs and one tank. In  the secondary works,  the
                                                               condominial  system  was proposed,  but  first, we built  the
                                                               secondary networks (mesh) to which the condominial system
                                                               networks, water and sewerage household connections and
                                                               sewers were spliced.

                                                               “Expansion and Improvement of the Public Driking Water and
                                                               Sewerage System in Ñaña and its Annexed Neighborhhods
                                                               Scheme, in Lurigancho-Chosica district”.              15

                                                               ”Expansion and Improvement of the Public Drinking Water   14
                                                               and Sewerage System for Paraíso Alto- Sector 308 Scheme,
                                                                                                                     páginas
                                                               in Villa María del Triunfo district”.

                                                               “Expansion and Improvement of the Public Drinking Water and
                                                               Sewerage System for Carabayllo -2nd Phase Comprehensive
                                                               Scheme”.

                                                               “Preparation  of Technical  File  and Final  Study, Social
                                                               Intervention  and Work Execution:  Installation  of Public
                                                               Drinking  Water and Sewerage System for Oquendo, Santa
                                                               Rosa and El Naranjal Scheme (Sectors 251, 252, 256 and