Page 15 - PERFIL CORPORATIVO IVC_Neat
P. 15
Obras Hidráulicas Saneamiento Hydraulic Works Sanitation
Other works executed for SEDAPAL were:
“Expansion of Public Drinking Water and Sewerage Networks
through Condominial Systems in various districts of Lima,
Package 2B-1”. This project was funded by the World
Bank through an IBRD loan, and involved the installation of
water pipelines and condominial branches, drinking water
household connections, sewerage pipelines and condominial
branches, and sewerage household connections.
“Installation of Public Drinking Water and Sewerage Systems
for Lomas de Zapallal Scheme in Puente Piedra district”.
General works involved the improvement of three existing
wells, treated water pipelines, discharge pipelines, three
reservoirs and one tank. In the secondary works, the
condominial system was proposed, but first, we built the
secondary networks (mesh) to which the condominial system
networks, water and sewerage household connections and
sewers were spliced.
“Expansion and Improvement of the Public Driking Water and
Sewerage System in Ñaña and its Annexed Neighborhhods
Scheme, in Lurigancho-Chosica district”. 15
”Expansion and Improvement of the Public Drinking Water 14
and Sewerage System for Paraíso Alto- Sector 308 Scheme,
páginas
in Villa María del Triunfo district”.
“Expansion and Improvement of the Public Drinking Water and
Sewerage System for Carabayllo -2nd Phase Comprehensive
Scheme”.
“Preparation of Technical File and Final Study, Social
Intervention and Work Execution: Installation of Public
Drinking Water and Sewerage System for Oquendo, Santa
Rosa and El Naranjal Scheme (Sectors 251, 252, 256 and