Page 36 - RoadCem Soil Stabilisation 2021
P. 36

RoadCem – Reversibility and Reinstatement








                                   RoadCem soil stabilisation can be reinstated using the following steps:-


                                         Deep re-mixing of the stabilised layer to achieve the desired soil granularity



                                         The addition of water and pH adjustment as necessary



                                         Replacement of stripped topsoil materials



                                         Tillage of topsoil into a tilth



                                         No additional surface layers to be disposed of