Page 38 - RoadCem Soil Stabilisation 2021
P. 38

RoadCem – Reversibility and Reinstatement












                                  RoadCem soil stabilisation can be reinstated using the following steps:-


                                       Deep re-mixing of the stabilised layer to achieve the desired soil granularity



                                       The addition of water and pH adjustment as necessary



                                       Replacement of stripped topsoil materials



                                       Tillage of topsoil into a tilth



                                       No additional surface layers to be disposed of


                                       RoadCem: The most sustainable soil stabilisation system available in the UK
   33   34   35   36   37   38   39   40   41   42   43