Page 22 - pipeline.pdf
P. 22

Reinstatement of Agricultural Subsoils








                    Proposed replacement Vs. reinstatement of stabilised subsoils after works


                 Our proposal is that temporary haul roads/working platforms that are no longer required are pulverised to granulate and used as self
                 compacting stabilised backfill material for pipe trenches and openings. Allowing the locally excavated trench subsoil material to be
                 placed where the haul road previously was – before the saved topsoil is over placed to complete reinstatement. This process would
                 avoid the need for full biological reinstatement of the stabilised layer and provide a reduced compensation opportunity for farmers
                 and their land agents.
                 Whilst the logistics sound complicated it offers a sustainable and sensible reuse of materials that meets environmental standards.
   17   18   19   20   21   22   23   24   25   26   27