Page 51 - SUSTAINABILITY REPORT 2020_FLIPBOOK VERSION.cdr
P. 51

Milestones






                                      1996                         2001                         2003                           2004





                             Incorporation of the company as   Waltersmith became a    Waltersmith participated in the first   Waltersmith executed a farm-out
                                a joint venture between       wholly owned Nigerian    Nigerian Marginal Oil Field licensing   Agreement with SPDC JV and took
                              Waltersmith & Associates and         company.           round organized by the FGN and was   over ownership and Operatorship
                                 Petroman Oil Limited.                                 awarded the Ibigwe Field located in   of the Ibigwe Field.
                                                                                                 OML 16.




                                      2011                         2010                          2009                          2008




                                Waltersmith commenced         Waltersmith ramped up       Commenced 1st phase of     Completed the re-entry of two existing
                                 its 2nd phase of Work          production to circa      Drilling Campaign. Drilled and   wells (IB-1&2), installed an EPF and
                                    Over & Drilling               2,200boepd.                completed Ibigwe           attained first oil at an average
                                     Campaign.                                                  4 & 5 wells.          production of 500bopd. Waltersmith
                                                                                                                     also commenced commercial export.



                                      2012                          2018                         2019                          2020





                            Concluded the drilling work-over and   Waltersmith attained   Waltersmith was awarded offshore   Commissioned our
                           completion of 4 wells. Production also   production rate of   block EG-23 by the Government of   5,000bpd(first phase) modular
                           ramped up to circa 4,400boepd and a   6,000boepd and drilled      Equatorial Guinea.         refinery in Ibigwe, Imo-State.
                           15,000boepd flow station was installed.   Ibigwe 9,10,11wells.
                            Waltersmith also acquired interest in
                            OML 34 as part of the ND Western
                                    Consortium.

                                                                                                                                                              51
                                                                                                                                                               51
   46   47   48   49   50   51   52   53   54   55   56