132 The Complete DESIGN BUILDER
Building Design:
Site Work
Excavation
demolition……………….strip/clear site…………cut/fill………….bulk excavate………..
trenching………………rock………….blasting…………unusual soil water……………..
hazardous/toxic waste removal…………………dump fees…………trucking……………
piling……………shoring………erosion control………………..tunneling………………
boring………………caissons……………hoarding………de-watering…………………
Backfilling
borrowed material……………native material……………building interior……………..
building exterior………………site………………………granulars…………sand………
compaction dry…………………….compaction wet……………..topsoil…………………
fill…………………………..consolidation…………………………testing……………..
Substructure
Foundations
1. poured in place concrete wall/footing…………………… 2. concrete block………………..
piles……..type…………………………….depth ………………….. pile caps …………….
3. poured in place concrete grade beam …………………………………………………………
4. poured in place individual piers/footings no walls……………………………………………
5. floating slab………… ……………………….. haunch perimeter …………………………..
pits………………………..trenches…………………….. bases…………………………
foundations back filled ………. one side………….. both sides……………… none…………….
basement………………….. full………………………………..partial………………………….
Superstructure
structural steel frame……… ………….. ……………….. ……………………………………….
pre-engineered steel structure …….. ………… ……………. ……………………………………
load bearing masonry………………………………………………………………………………
poured in place reinforced concrete frame…………………………………………………………
concrete tilt - up…………………………………………………………………………………….
steel/wood frame…………………………………………………………………………………….
wood frame ………………………………………………………………………………………….