132                         The Complete DESIGN BUILDER


               Building Design:




               Site Work

                              Excavation
                              demolition……………….strip/clear site…………cut/fill………….bulk excavate………..
                              trenching………………rock………….blasting…………unusual soil water……………..
                              hazardous/toxic waste removal…………………dump fees…………trucking……………
                              piling……………shoring………erosion control………………..tunneling………………
                              boring………………caissons……………hoarding………de-watering…………………

                              Backfilling
                              borrowed material……………native material……………building interior……………..
                              building exterior………………site………………………granulars…………sand………
                              compaction dry…………………….compaction wet……………..topsoil…………………
                              fill…………………………..consolidation…………………………testing……………..

               Substructure


                              Foundations
                              1.   poured in place concrete wall/footing……………………  2. concrete block………………..

                                 piles……..type…………………………….depth ………………….. pile caps …………….

                              3.   poured in place concrete grade beam …………………………………………………………
                              4.   poured in place individual piers/footings no walls……………………………………………
                              5.   floating slab………… ……………………….. haunch perimeter …………………………..

                                     pits………………………..trenches…………………….. bases…………………………

                              foundations back filled ………. one side………….. both sides……………… none…………….
                              basement………………….. full………………………………..partial………………………….

               Superstructure

                              structural  steel  frame………  …………..  ………………..  ……………………………………….

                              pre-engineered  steel  structure  ……..  …………  …………….  ……………………………………

                              load  bearing  masonry………………………………………………………………………………

                              poured  in  place  reinforced  concrete  frame…………………………………………………………

                              concrete  tilt  -  up…………………………………………………………………………………….

                              steel/wood  frame…………………………………………………………………………………….

                              wood frame ………………………………………………………………………………………….